Opened 2004
Construction began 1993
Pump-generators6 reversible Francis turbines
Hydraulic head887 m (2,910 ft)
Construction cost$900 million USD
Did you knowTianhuangping Pumped Storage Power Station is the sixth-largest pumped-storage hydroelectric power station by capacity (1,836 MW).
Date of Reg.
Date of Upd.
ID1231908
Send edit request

About Tianhuangping Pumped Storage Power Station


The Tianhuangping Pumped Storage Power Station is a pumped-storage power station in Tianhuangping, Anji County of Zhejiang Province, China. The power station has an installed capacity of 1,836 megawatts utilizing 6 reversible Francis turbines. Construction began in 1993 and the power station was completed in 2004.