Neelum–Jhelum Hydropower Plant
| Use attributes for filter ! | |
| Address | I-8\H-8 Interchange، Islamabad Highway، Islamabad |
|---|---|
| Opened | August 14, 2018 |
| Dam volume | 156,000 m3 (204,040 cu yd) |
| Construction cost | 515 billion PKR ($5. 1 billion, Levelised Tariff Rs 13. 50 per unit) |
| Annual generation | 5,150 GWh |
| Date of Reg. | |
| Date of Upd. | |
| ID | 2313554 |
About Neelum–Jhelum Hydropower Plant
The Neelum–Jhelum Hydropower Plant is part of a run-of-the-river hydroelectric power scheme in Azad Kashmir, Pakistan-administered Kashmir, designed to divert water from the Neelum River to a power station on the Jhelum River.
Click on the photo of Neelum–Jhelum Hydropower Plant to view it on Google Maps.