Gotthard Base Tunnel
| Use attributes for filter ! | |
| Opened | June 1, 2016 |
|---|---|
| Length | 151. 840 km (94. 349 mi) |
| Locations | Switzerland |
| Uri | |
| Graubünden | |
| Ticino | |
| Line | Gotthard Line |
| Traffic | Railway |
| Did you know | It surpassed the Seikan Tunnel in Japan, which is 53. 9 kilometers long, and Eurotunel in the UK, which is 50. 5 kilometers long. |
| Date of Reg. | |
| Date of Upd. | |
| ID | 1137939 |
About Gotthard Base Tunnel
The Gotthard Base Tunnel is a railway tunnel through the Alps in Switzerland. It opened on 1 June 2016, and full service began on 11 December 2016. With a route length of 57. 09 km, it is the world's longest railway and deepest traffic tunnel and the first flat, low-level route through the Alps.