Fort Pitt Tunnel
| Use attributes for filter ! | |
| Length | 1. 102 km |
|---|---|
| Traffic | Automobile |
| Tunnel clearance | 13. 5 feet (4. 1 m) |
| No. of lanes | 4 |
| Design engineer | Michael Baker, Jr. |
| Vehicles per day | 107,000 |
| Date of Reg. | |
| Date of Upd. | |
| ID | 3054693 |
About Fort Pitt Tunnel
The Fort Pitt Tunnel is a vehicular tunnel under Mount Washington in Pittsburgh, Pennsylvania. It connects the West End region on the southwest side to the South Shore neighborhood on the northeast side. The adjoining Fort Pitt Bridge on the northeast end connects to Downtown Pittsburgh.