Deriner Dam
| Use attributes for filter ! | |
| Height | 24900 (cm) |
|---|---|
| Opened | February 24, 2012 |
| Construction cost | ~2 billion USD |
| Annual generation | 2118 GWh |
| Spillway capacity | Over-flow: 2,250 m3/s (79,000 cu ft/s); Orifice:7,000 m3/s (250,000 cu ft/s) |
| Owners | State Hydraulic Works |
| Date of Reg. | |
| Date of Upd. | |
| ID | 1108409 |
About Deriner Dam
Deriner Dam is a concrete double-curved arch dam on the Çoruh River 5 km east of Artvin in Artvin Province, Turkey. The main purpose of the dam is hydroelectric power production and additionally flood control.