Central Area Transmission System
| Use attributes for filter ! | |
| Operator | Kellas Midstream Limited |
|---|---|
| Inaugurated | May 1993 |
| Commissioned | 1993 |
| Length | 404 km (251 mi) |
| Date of Reg. | |
| Date of Upd. | |
| ID | 2210257 |
About Central Area Transmission System
The Central Area Transmission System is a natural gas transportation and processing system that transports gas through 404 kilometres of pipeline from the Central North Sea to a reception and processing terminal at Teesside in the North East of England.