BARD Offshore 1
| Use attributes for filter ! | |
| Opened | August 26, 2013 |
|---|---|
| Construction began | March 2010 |
| Distance from shore | 90 km (56 mi) |
| Locations | North Sea |
| Rotor diameter | 122 m (400 ft) |
| Owners | Enovos |
| Date of Reg. | |
| Date of Upd. | |
| ID | 2026755 |
About BARD Offshore 1
BARD Offshore 1 is a 400 megawatt North Sea offshore wind farm with 80 BARD 5. 0 turbines. Construction was finished in July 2013 and the wind farm was officially inaugurated in August 2013. The wind farm is located 100 kilometres northwest of the isle Borkum in 40-metre deep water.